Case studies
Filter your search Close
No Frosty Reception For Polypipe's Domus Thermal At Scottish Student Accommodation
Polypipe Ventilation’s Domus rigid duct and unique Domus Thermal duct insulation systems...
View Case Study >New London W1 Development Uses Polypipe's Domus Ducting
Polypipe Ventilation has seen its high quality range of Domus rigid ducting systems...
View Case Study >New Installation For New Polypipe Radial Duct System
The first installation of the recently launched Domus Radial Duct System from Polypipe...
View Case Study >New Coastal Housing Development Uses Polypipe Heating Recovery Systems
Polypipe Ventilation’s award winning Silavent Green Line HRX Mechanical Ventilation with...
View Case Study >London Regeneration Scheme Uses Polypipe Heat Recovery Systems
Paynes & Borthwick development in West Greenwich, London has been fitted with...
View Case Study >Large London Regeneration Scheme to Use Polypipe Heat Recovery System
Polypipe Ventilation’s HRX Mechanical Ventilation with Heat Recovery (MVHR) systems are...
View Case Study >Grand Designs ‘Cob Castle’ Features Polypipe Heat Recovery System
Kevin McCabe is the leading living exponent of the ancient art of cob building – building...
View Case Study >Eco Lodge Uses Polypipe Heat Recovery and Radial Duct Systems
Mill Meadow Eco-Homes, a luxury, self-catering, eco lodge holiday development situated on...
View Case Study >Domus Solves Ducting Problem For The Heart Development
Polypipe Ventilation has had its Domus ducting installed into the award winning The Heart...
View Case Study >Care Homes Benefit From Polypipe Ventilation
Domus ducting and Silavent Curzon fans from Polypipe Ventilation have been specified and...
View Case Study >Innovative Hybrid SUDS System Provides the Solution for the A3 Hindhead Improvement Project
Four separate soakaway structures, including a circular modular cell installation, manage...
View Case Study >Polypipe Ducting Proves A Winner For Olympic Park Development
Polypipe Ventilation has been awarded a substantial order for its ducting systems for the...
View Case Study >